• 3-Phase 2HP 1.6kw Vacuum Pump in Welding Extraction System
  • 3-Phase 2HP 1.6kw Vacuum Pump in Welding Extraction System
  • 3-Phase 2HP 1.6kw Vacuum Pump in Welding Extraction System
  • 3-Phase 2HP 1.6kw Vacuum Pump in Welding Extraction System

3-Phase 2HP 1.6kw Vacuum Pump in Welding Extraction System

Warranty: 2 Year
Oil or Not: Oil Free
Structure: Rotary Vacuum Pump
Exhauster Method: Side Channel
Vacuum Degree: High Vacuum
Work Function: Mainsuction Pump
Customization:
Manufacturer/Factory, Trading Company

360° Virtual Tour

Diamond Member Since 2010

Suppliers with verified business licenses

Guangdong, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Years of Export Experience
The export experience of the supplier is more than 10 years
Fast Delivery
The supplier can deliver the goods within 15 days
to see all verified strength labels (29)
  • Overview
  • Technical Paramater
  • Product Features
  • Accessories
  • Installation Instructions
Overview

Basic Info.

Model NO.
GHBH 002 34 1R5
Working Conditions
Dry
Color
Golden/ Silvery
Application
Pneumatic Conveying, Dental Vacuum Water Treatment
Phase
3
Stage
Double
Frequency
50/ 60 Hz
Weight
42 Kg
Transport Package
Wrapped by Plywood, Then Inside Carton
Specification
CE/RoHS/SGS/ISO
Trademark
Goorui
Origin
China
HS Code
8414100090
Production Capacity
500 Set/ Day

Product Description

Technical Paramater
Model No. GHBH 002 34 1R5
Frequency 50Hz 60Hz
Rated Power 1.6kW 2.05kW
Rated Voltage 200-240/345-415Y (V) 220-275/380-480Y (V)
Rated Current 7.5/4.3Y (A)  7.6/4.4Y (A)
Max Airflow 210m³/h 255m³/h
Max Vacuum -200mbar -220mbar
Max Pressure 190mbar 210mbar
Sound 64db(A) 70db(A)
Weight 21kg 21kg
3-Phase 2HP 1.6kw Vacuum Pump in Welding Extraction System
Product Features

GOORUI Side channel blowers are maintenance-free:
·External, permanently lubricated bearings
·Contactless rotating impellers
·Fan-cooled motors

GOORUI Side channel blowers are user-friendly:
·Weight-optimised design through aluminum pressure casting parts
·Possibility for a vertical or horizontal installation
·Suitability for converter operation

GOORUI Side channel blowers are environmentally friendly:
·Oil-free operation
·Low energy requirement
·Low noise emission

GOORUI Side channel blowers can be used world-wide:
·50/60Hz voltage range motors of the Iso class F
·Protection type IP55 with an integrated thermal protection switch (standard)
·CE, TUV, RoHS, CCC and ISO9001 certifications

 

Accessories

3-Phase 2HP 1.6kw Vacuum Pump in Welding Extraction System

Installation Instructions

INSTRUCTIONS
1. It should be placed in a relatively stable place, and the surrounding environment should be clean, dry and ventilated.
2. The direction of rotation of the impeller must be consistent with the direction of the pointed tip marked on the fan cover.
3. When working, the working pressure should not be greater than 8 kPa, so as to avoid excessive heat generation of the air pump and damage to the air pump caused by motor overcurrent.
4. It is strictly forbidden for solid, liquid and corrosive gas to enter the pump body.
5. The filters and silencers at both ends of the air inlet and outlet should be cleaned in time according to the situation to avoid clogging and affecting use.
6. The external connection of the air inlet and outlet must be connected by a hose (rubber tube, plastic spring tube).


PRECAUTIONS
1. Flat washers and spring washers must be used to tighten the screws.
2. It is best to use rubber buffer rubber to bear the weight of the vortex air pump, especially the high-power vortex air pump, which is indispensable.
3. For some occasions that require noise, a silencer can be installed to reduce the noise (generally down, about 5 dB), the silencer is installed at the end of the inlet duct or outlet duct.
4. For some occasions with high requirements for noise, you can add a layer of silencer cotton according to the conditions of the machine itself to meet the noise requirements on site. For details, please consult our customer service.
5. When using silencing cotton to silence the sound, pay attention to the distance between the vortex air pump and the box, pay attention to the ventilation and heat dissipation of the vortex air pump, and pay attention to using rubber cushioning to bear the weight of the vortex air pump. According to the picture, you need to consult customer service.
6. The air inlet and outlet of the vortex air pump For pipe connection, hose connection should be used to isolate vibration.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2010

Suppliers with verified business licenses

Manufacturer/Factory, Trading Company
Registered Capital
1000000 RMB
Plant Area
>2000 square meters